🔧 Project Desk: Quote in 24 hours • 📑 Tenders welcomed (GeM & eProcure)
Direct Projects • Retrofits • AMC • OEM/MRO Supply

Direct Electrical Projects, OEM Supply & Services for Heavy-Load Sites ⚡

We deliver EPC, Testing & Commissioning, Retrofits, AMC and MRO/OEM supply — 11–66 kV substations, HT panels, bus ducts, protection & relays, earthing and lightning protection. Direct PO ✅ • Rate Contracts ✅ • Tenders (GeM/eProcure) ✅

Power Grid substation — Jamshedpur, India
🏭 Industrial 🛣️ Infrastructure ⚙️ Utilities 🖥️ Data Centers

Services

Pick a category to explore deliverables and scope. Tip: press Ctrl/Cmd + K to jump anywhere.

Design

SLD & System Studies

Load list, short-circuit, protection coordination, earthing grid and lightning protection layout.

Build

HT Panels, Transformers, Bus Ducts

Supply/installation, cable routing, terminations, rising mains, SCADA & time sync.

Handover

Documentation & CEIG Support

Method statements, ITPs, FAT/SAT, red-lines, as-builts, O&M manuals and CEIG coordination.

Primary

Primary Injection & Hi-Pot/VLF

Primary injection, HV tests, IR/PI, contact resistance, CT/PT polarity and ratio checks.

Secondary

Protection & Relay Settings

OC/EF, differential, distance protection, SOE verification and end-to-end trip checks.

Reports

NABL-Traceable Measurements

Calibrated instruments with traceable certificates and digitally signed reports.

Shutdown

Legacy Gear Replacement

Panel/relay upgrades, bus duct re-routing, cable derating studies, and staged cutover plans.

Reliability

Protection Coordination

Discrimination studies, fault clearing times, arc flash review and mitigation actions.

Modernize

Automation & SCADA

SOE, time-sync (IRIG-B/NTP), remote monitoring and alarm rationalization.

Preventive

Planned Maintenance

Calendar PM, lubrication, torque checks, breaker timing, thermal scans and reports.

Corrective

24×7 Support

Breakdown response, spares strategy, vendor coordination and root cause analysis.

Insights

Digital Health Reports

Asset health dashboards, incident logs, MTBF/MTTR and improvement actions.

Power Quality

Harmonics & PF

Harmonic analysis, PF correction, load balancing, capacitor bank optimisation.

Safety

Earthing & Lightning

Soil resistivity, earthing grid tests, surge protection placement and test certificates.

Compliance

Documentation Packs

CEIG-ready dossiers, checklists, method statements and calibration certificates.

CT / PT Helper 🧮

Fast sanity checks for field engineers. (Always validate with detailed calculations & OEM charts.)

Tip: Keep CT loading within class limits (e.g., 5P10/10P10). Use proper knee-point checks for protection CTs.

Includes: ratio primary estimate, approx. apparent load, and reminder on class (e.g., 0.5, 0.2S, 5P10). For PTs, verify VT ratio (e.g., 66kV/√3 : 110V/√3) and burden class.

OEM / MRO Supply 🧰

Approved OEMs • Dispatch tracking • Warranty handling • Commissioning support.

HT Panels

VCB/SFU Panels, Protection Relays

Line-ups, feeder panels, breaker retrofits, relay upgrades.

Transformers

Power/Distribution, NGR, AVR

Oil/Dry type, CTs/PTs, accessories and Buchholz/PRV.

Bus Ducts & Cables

Rising Mains, HT/LT Cables

Routing, trays, terminations, joints and test kits.

Earthing & Lightning

Chemical/CI electrodes, ESE/SPD

Exothermic welding kits, test links and reports.

How We Deliver 🛠️

1Share SOW/SLD/BOQ
2Clarifications & Quote (24h)
3ITP & Method Statements
4Mobilisation & Execution
5T&C & Documentation
6Handover & AMC
0
kV Class
0
Projects Delivered
0
hr Quote Turnaround
0
% Planned Uptime

Featured Projects 🧷

Capabilities & Documentation 📚

Technical

  • HT Panels (VCB/SFU), Transformers, CT/PT, AVR
  • Bus Ducts, Rising Mains, HT/LT Cabling
  • Protection & Relays: Differential, Distance, OC/EF
  • SCADA/Automation integration, SOE, Time Sync

Quality & Safety

  • Method Statements, ITPs, FAT/SAT, Checklists
  • NABL-traceable test equipment & calibration
  • LOTO, PPE, PTW, Toolbox Talks
  • SLDs, red-lines, as-builts, O&M manuals

What Clients Say 💬

“Planned shutdown and restart executed perfectly. Documentation was thorough.” — Industrial Client
“OEM supply arrived on time with commissioning support—no surprises.” — Data Center Client
“Relay coordination and CEIG support made approvals seamless.” — Utility Client

Contact ✉️

AMC Spark & Services

Address: C-7, GF, RPS Palms, Sector 88, Faridabad, Haryana 121002

Open in Google Maps →

Quick Message

We usually reply within 24 hours. For tenders, attach docs in Project Desk.

Project Desk — Get a Quote in 24 Hours 📝

Direct PO • Rate Contracts • Tenders (GeM/eProcure). Upload SOW/SLD/BOQ; we’ll revert with clarifications + quote.

Get a Quote